Solstice Project February 12th, 2023

Site visit February 12th 2023

Solstice Project February 12th, 2023

Site visit February 12th 2023

Solstice Video February 12th 2023

Sites 42, 43, 47, & 37 are well under way.  42 and 43 are model homes  and progressing well.  Sites 37 & 47 currently have framing going up.

A second video is also available for viewing sites 42 and 43.  A low level flight was performed in each model home.  Viewers should note the video has some stabilization issues due to high winds outside coming through the currently open windows.  It was like flying through a wind tunnel at points.  As the project progresses we’ll update flights through the building interiors.

January 28th and February 12th 2023 Orthomosaic
Before & After

February 12th flight for Sites 42, 43, 47, & 37.  Sites 42 and 43 are nearly closed up.  Sites 37 and 47 have walls going up.

January 28th and February 12th 2023 Orthomosaic Before & After

February 12th flight for Sites 42, 43, 47, & 37.  Sites 42 and 43 are nearly closed up.  Sites 37 and 47 have walls going up.

3D Site Model

This is a 3D Model captured for the February 12th site visit. As the build proceeds a new model will be generated for each site visit.  Annotations will be added as more develops.  Click & Drag to rotate the model, scroll to zoom in and out of the model.  You can also set the model to full screen as well.

3D Site Model

This is a 3D Model captured for the February 12th site visit. As the build proceeds a new model will be generated for each site visit.  Annotations will be added as more develops.  Click & Drag to rotate the model, scroll to zoom in and out of the model.  You can also set the model to full screen as well.

Still Image Gallery February 12th

Sites 37, 42, 43, and 47 are progressing quickly.  To view larger images simply double click on one image, and then arrow through the images.

Solstice Video February 12th 2023

Sites 42, 43, 47, & 37 are well under way.  42 and 43 are model homes  and progressing well.  Sites 37 & 47 currently have framing going up.

A second video is also available for viewing sites 42 and 43.  A low level flight was performed in each model home.  Viewers should note the video has some stabilization issues due to high winds outside coming through the currently open windows.  It was like flying through a wind tunnel at points.  As the project progresses we’ll update flights through the building interiors.

Still Image Gallery February 12th

Sites 37, 42, 43, and 47 are progressing quickly.  To view larger images simply double click on one image, and then arrow through the images.

POWERED BY PRO