Ground has been broken on 4 sites.  Currently the sites 42, 43, 47, and 37 are under way.  Both site 42 and 43 have concrete poured and framing has begun.  The video player now has 2 videos in it.  The flight on the 8th showcased the initial ground work.  The flight from the 14th shows the framing going up on 42 & 43

December 22nd & January 8 2023 Orthomosaic Before & After

January 8th’s flight showcases 4 build sites at present.  Sites 42, 43, 47, & 37 can be seen now.  Site number 42 and 43 have concrete poured, and are ready to start framing

3D Site Model

This is the third 3D model rendered for the Solstice project, created January 8th 2023.  As the build proceeds a new model will be generated for each site visit.  Annotations will be added as more develops.  Click & Drag to rotate the model, scroll to zoom in and out of the model.  You can also set the model to full screen as well.

Still Image Gallery January 8th & 14th 2023

Showcasing sites 37, 42, 43, & 47, due to their groundbreaking and initial land preparation.  Both 42 & 43 have concrete poured and framing has started.  As additional lots come on line they will be cataloged as well to show the over all site changes on the Solstice Project.