Solstice Project April 16th, 2023

Sites 42, 43, 44, 47, 37, & 35 Active

Solstice Project April 16th, 2023

Sites 42, 43, 44, 47, 37, & 35 Active

Solstice Video April 16th 2023

Sites 42, 43,44, 47, 37, & 35 are active.

A second video is also available for viewing sites 42, 43, & 47.  A low level flight was performed in each model home.  As the homes continue to fill in we’ll do more in depth fly throughs.

April 1st & April 16th  Orthomosaic
Before & After

Currently active sites are 42, 43, 44, 47, 37, & 35.  Use the before and after slider to get a quick view at the changes over the last site visit April 1st.

April 1st & April 16th  Orthomosaic
Before & After

Currently active sites are 42, 43, 44, 47, 37, & 35.  Use the before and after slider to get a quick view at the changes over the last site visit April 1st.

3D Site Model

This is a 3D Model captured for the  April 16th site visit.  Viewers can click on the model to zoom in and out, and move around the model.

Home sites 42, 43, 44, 47, 37, & 35 are represented in this model.

3D Site Model

This is a 3D Model captured for the  April 16th site visit.  Viewers can click on the model to zoom in and out, and move around the model.

Home sites 42, 43, 44, 47, 37, & 35 are represented in this model.

Still Image Gallery April 16th 2023

Sites 35, 37, 42, 43, 44, and 47 are all active build sites.  To view larger images simply double click on one image, and then arrow through the images.

Solstice Video February 12th 2023

Sites 42, 43, 47, & 37 are well under way.  42 and 43 are model homes  and progressing well.  Sites 37 & 47 currently have framing going up.

A second video is also available for viewing sites 42 and 43.  A low level flight was performed in each model home.  Viewers should note the video has some stabilization issues due to high winds outside coming through the currently open windows.  It was like flying through a wind tunnel at points.  As the project progresses we’ll update flights through the building interiors.

Still Image Gallery April 16th 2023

Sites 35, 37, 42, 43, 44, and 47 are all active build sites.  To view larger images simply double click on one image, and then arrow through the images.

 

POWERED BY PRO